Knitting · Sewing · Year of Projects

YOP – year 8 – wrap up

It really doesn’t feel quite like a year since we started year 8 of the Year of Projects, a group on Ravelry here for crafters and makers to combine there hobbies along with a love of blogging. Year of Projects is something I’ve participated in from the beginning and I did debate whether I would or not join in for this the 8th year with all that was going on in my life this time last year. I was a couple of weeks late into starting but I’m really glad I did, it was one of the two best things I decided to do.

I began with two main focus points for the year in my list.

The first focus point was around my desire and personal challenge to create a me made wardrobe. This I was aiming to achieve through both knitted and sewn garments. On this front generally I’m pleased with what I accomplished. My knitted garments section on my list was a success. The sewn garments wasn’t as much of a success in that not as much got crossed off, but what I discovered along the way has helped form where I want to go with my sewn garments more, so in this respect I’ve learnt and grown and it’s hard to call that a failure.

On the knitted garment list I had a total of 9 garments and 8 were completed, you’ll see from the last picture that the 9th garment is on the button bands and within the next couple of days should be complete. Here’s a look through them all. I love the green Bentley garment for style (top row right) but love the fit of my Colouring (middle row centre) and Cumulus (middle row left) has to be my favourite garment make of the entire YOP year. The garment I’m least pleased with is the Fintry (top row left) and this you might remember is the one I reworked the neckline at the time, well a year on and I’m still not in love with that garment. The other garments I’ve just not had a chance to wear them as much to decide how much or little I like them. All the things I’ve learnt from each of these garments I hope to bring on into next years makes and most of the time I’m making my own modifications within the garments anyway, which is something you’ll see lots of next year.

 

On the sewn garments section of this list there were 18 different items. 6 of which were made, the Cuff Top I made two versions of, as well as the Margot Pyjamas. As I said my ideas on what I wanted to sew changed and are now more in line with what I like and want from my knitted garments, a more fitted style. This made some of the items on the sewn list unsuitable, so it’s likely a good thing that they didn’t get made. Here is a look at some of the items that were made. I love the Cuff Tops and of all the things I made these get worn the most, in part because I graded them to fit me just how I’ve discovered I like my garments fitting. The Margot Pyjamas no longer fit due to weight loss, which is a shame as they were really comfy and the Hollyburn skirt is my least favourite make but only because I don’t like that style and I should have thought about that aspect of garment making more in this past year but again is something that will hopefully be put into upcoming garments.

 

The only other section on my YOP list was a sock section and the aim here was to complete 6 pairs of socks over the year. These were not a main focus of the list but did provide an interesting break in the bigger projects. I completed 7 pairs of socks for myself and one each for Evelyn and Elizabeth. Along the way I also frogged 3 pairs of socks where the project just wasn’t enjoyable. Here is a look at the socks that were completed.

 

The second point of focus for my YOP list was to get back to enjoying each project fully from beginning to end. I started off the year working on one knitted and one sewn garment at a time and this was working but soon after the start of this YOP year I switched to working monogamously on one project solely at a time. This was the second best decision I made for me personally. This allowed me focus on just the project on hand and while working solely on it I found I was enjoying each project more, right from the planning to the finished item. I also found I was a lot more productive, not that I knit faster but more that I was just focusing fully on the project until complete. Going forward I’m going to continue this approach for as long as this works for me.

That brings this whole YOP year 8 post to a wrap. It was an enjoyable year as always participating with all the other YOPers and I look forward to Year 9, which will begin with the opening post and list next week.

If you would like to join in or read about other YOP participants, you can find the YOP group and weekly posts HERE

Ruth.

 

Knitting · Year of Projects

YOP – year 8 – week 52

The weeks have flown by and here we are at the end. This year we have one extra week in how the weeks have fallen and so next week is the week I get to do a wrap up post. Which is good and works in my favour because the Mae cardigan is close…so close to being finished. There are a 4 more decreases on the second arm, then some rows and then the ribbing. With this extra week I’m hopeful of getting that done along with neck and button bands so it can be included in next weeks wrap up post. It may not be blocked…who am I kidding, it won’t be blocked (shhh but I’ve not blocked the Magnolia jumper I completed before the Mae yet either) but the blocking can be done at any point…it’ll be grand.

Mae Cardigan

And so for the last time this YOP year here is a the list and how it looks;

Year of Projects 2018-2019 List

Knitted Garments

  • Fintry – started July 7th – finished August 9th
  • Lichen – started August 11th – finished October 10th
  • Bentley – started October 13th – finished December 9th
  • Gingerbread – started March 26th – finished April 5th
  • Coloring – started January 1st – finished January 20th
  • Aster – started January 27th – finished February 26th
  • Cumulus Blouse – started October 20th – finished December 20th
  • Magnolia – started April 14th – finished May 4th
  • Mae Cardigan – started May 8th –

Sewn Garments

Socks

6 pairs

  • My Dearest Loveliest Elizabeth – started July 16th – FROGGED
  • Sock #1– started August 10th – finished August 26th 
  • Sock #2 – started August 30th – finished September 30th 
  • Sock #3 – started October 11th – FROGGED
  • Sock #4 – started November 4th – finished December 6th 
  • Sock #5 – started November 17th – FROGGED
  • Sock #6 – started December 10th – finished December 30th
  • Sock #7 – started January 4th – finished January 27th
  • Evelyns Socks – started March 1st – finished March 5th
  • Sock #8 – started March 7th – finished March 18th
  • Elizabeths Socks – started March 18th – finished March 24th
  • Sock #9 – started April 5th – finished April 14th

You can find the YOP group and weekly posts HERE

Ruth.

Knitting · Year of Projects

YOP – year 8 – week 51

This week I’ve made steady progress on the first sleeve of my Mae cardigan. It’s coming along nicely and relatively quickly considering the little time spent on it but it is extremely enjoyable. I love the pattern and the yarn in particular and I want to make some other projects out of this Mondim yarn. I am working the decreases as stated and will work to my preferred sleeve length, I did debate briefly making 3/4 length sleeves and may still yet but for now the only notable modification I’ve made is to add the extra purl stitch which will be made into a seam once the garment is complete. This I’ve done throughout the body as well, I’m not sure if I mentioned that, but I’ll speak about all the modifications once the garment is finished and blocked.

Mae Cardigan

And that is it for the week and this is the project I’m going to be working on throughout this week and into our wrap up post week.

There was a post HERE about my first walk along The Old Rail Trail for anyone interested.

This list is looking like this;

Year of Projects 2018-2019 List

Knitted Garments

  • Fintry – started July 7th – finished August 9th
  • Lichen – started August 11th – finished October 10th
  • Bentley – started October 13th – finished December 9th
  • Gingerbread – started March 26th – finished April 5th
  • Coloring – started January 1st – finished January 20th
  • Aster – started January 27th – finished February 26th
  • Cumulus Blouse – started October 20th – finished December 20th
  • Magnolia – started April 14th – finished May 4th
  • Mae Cardigan – started May 8th –

Sewn Garments

Socks

6 pairs

  • My Dearest Loveliest Elizabeth – started July 16th – FROGGED
  • Sock #1– started August 10th – finished August 26th 
  • Sock #2 – started August 30th – finished September 30th 
  • Sock #3 – started October 11th – FROGGED
  • Sock #4 – started November 4th – finished December 6th 
  • Sock #5 – started November 17th – FROGGED
  • Sock #6 – started December 10th – finished December 30th
  • Sock #7 – started January 4th – finished January 27th
  • Evelyns Socks – started March 1st – finished March 5th
  • Sock #8 – started March 7th – finished March 18th
  • Elizabeths Socks – started March 18th – finished March 24th
  • Sock #9 – started April 5th – finished April 14th

You can find the YOP group and weekly posts HERE

Ruth.

Knitting · Year of Projects

YOP – year 8 – week 50

Good morning folks, just checking in today with some progress on my Mae Cardigan. It finally seems to be motoring along as I am now on the ribbing on the bottom of body. The body only had to get to 10″ so it’s a short, cropped size and why it took this long I can’t say but it did!

I might still have time to get this off the needles yet before this YOP year ends, that is the main aim for right now. Today I’m going to settle down and work on getting the ribbing done and a sleeve picked up and started.

Mae Cardigan

I may head out later for a walk but have pushed off an 18/23k walk to just rest, I’ve been pushing it a bit lately. My recent walking post can be read here and I should have another post going up this week about a 22k walk along the first stage of the Old Rail Trail.

I’ve gotten some writing done and quite a bit of reading after a visit to the library to stock up on some new reading material. Other than that it’s been a quiet week.              I’ve drafted up my end of year post as well as my first post for next year as I’ve been finalising my list. I’ve made a few graphics which I’ll share with the group later this week so if they wish to use them they can and that has been my making week.

So this year’s list looks like this;

Year of Projects 2018-2019 List

Knitted Garments

  • Fintry – started July 7th – finished August 9th
  • Lichen – started August 11th – finished October 10th
  • Bentley – started October 13th – finished December 9th
  • Gingerbread – started March 26th – finished April 5th
  • Coloring – started January 1st – finished January 20th
  • Aster – started January 27th – finished February 26th
  • Cumulus Blouse – started October 20th – finished December 20th
  • Magnolia – started April 14th – finished May 4th
  • Mae Cardigan – started May 8th –

Sewn Garments

Socks

6 pairs

  • My Dearest Loveliest Elizabeth – started July 16th – FROGGED
  • Sock #1– started August 10th – finished August 26th 
  • Sock #2 – started August 30th – finished September 30th 
  • Sock #3 – started October 11th – FROGGED
  • Sock #4 – started November 4th – finished December 6th 
  • Sock #5 – started November 17th – FROGGED
  • Sock #6 – started December 10th – finished December 30th
  • Sock #7 – started January 4th – finished January 27th
  • Evelyns Socks – started March 1st – finished March 5th
  • Sock #8 – started March 7th – finished March 18th
  • Elizabeths Socks – started March 18th – finished March 24th
  • Sock #9 – started April 5th – finished April 14th

You can find the YOP group and weekly posts HERE

Ruth.

 

Knitting · Year of Projects

YOP – year 8 – week 49

This week feels like I’ve finally made progress on my Mae cardigan. It’s just been plodding along for the last couple of weeks, but a shift happened somewhere in the middle of this week and I’ve suddenly been working on it at every opportunity. I have now split for the sleeves and I’m now progressing along nicely with the body.

I love the detail of the cables down the fronts and I’m close to deciding whether to add in some waist shaping into this item. It is a slightly cropped cardigan, somewhat similar in length to the Bentley I knit earlier in this YOP year and I wish I had waist shaping in that so going on that desire I will probably end up adding in the waist shaping.

Mae Cardigan

I haven’t worked too many rows on my blanket this week as I’ve been out walking quite a good bit and if you follow me on Instagram you will know this weekend has had lots of walks so far. There is going to be lots to write about next week on my walking blog. I’ve also settled down to a better writing routine during the day, so that too has limited the amount of making time but it feels like I’m finding a good routine between it all, perhaps the odd tweak here and there but otherwise it’s finding it’s way.

So the list, still looks pretty much the same; but here it is

Year of Projects 2018-2019 List

Knitted Garments

  • Fintry – started July 7th – finished August 9th
  • Lichen – started August 11th – finished October 10th
  • Bentley – started October 13th – finished December 9th
  • Gingerbread – started March 26th – finished April 5th
  • Coloring – started January 1st – finished January 20th
  • Aster – started January 27th – finished February 26th
  • Cumulus Blouse – started October 20th – finished December 20th
  • Magnolia – started April 14th – finished May 4th
  • Mae Cardigan – started May 8th –

Sewn Garments

Socks

6 pairs

  • My Dearest Loveliest Elizabeth – started July 16th – FROGGED
  • Sock #1– started August 10th – finished August 26th 
  • Sock #2 – started August 30th – finished September 30th 
  • Sock #3 – started October 11th – FROGGED
  • Sock #4 – started November 4th – finished December 6th 
  • Sock #5 – started November 17th – FROGGED
  • Sock #6 – started December 10th – finished December 30th
  • Sock #7 – started January 4th – finished January 27th
  • Evelyns Socks – started March 1st – finished March 5th
  • Sock #8 – started March 7th – finished March 18th
  • Elizabeths Socks – started March 18th – finished March 24th
  • Sock #9 – started April 5th – finished April 14th

You can find the YOP group and weekly posts HERE

Ruth.